The CAR revisions behind AeroLarke’s rule packs
Which issue and revision of CAR 7-J-III and CAR 7-J-IV the rule packs follow, and how a new revision reaches your operation without rewriting your history.
Flight and duty time limits in India come from the DGCA’s Civil Aviation Requirements, Section 7, Series J. Each part is issued and then revised, and a crew office needs to know which revision its software checks against. These are the revisions behind AeroLarke’s two rule packs.
| Rule pack | For | Issue | Revision |
|---|---|---|---|
| CAR 7-J-III | Scheduled air transport | Issue III, 24 April 2019 | Rev 2, 26 March 2024 |
| CAR 7-J-IV | Scheduled commuter, non-scheduled and general aviation (fixed wing) | Issue I, 23 March 2021 | Rev 1, 19 January 2023 |
CAR 7-J-III, Issue III, Rev 2
Rev 2 is dated 26 March 2024. In the text the rule pack was checked against, only the first two pages carry the Rev 2 date; the remaining pages carry the Rev 1 footer of 8 January 2024. In other words, Rev 2 changed only those first two pages.
The computerised-system and pre-flight clauses that matter most for crew software are paras 17.7 and 17.8. The compliance page maps each of them to what AeroLarke does.
CAR 7-J-IV, Issue I, Rev 1
Rev 1 is dated 19 January 2023. At the time of writing, in November 2026, the DGCA listing shows it as the latest revision of CAR 7-J-IV.
Two cross-references in Rev 1 still point at old paragraph numbers: para 18.2(e) refers to cumulative flight time “as per Para 8”, and para 17.6.4 to paras 11.7 and 11.6. AeroLarke reads them as para 9 (cumulative limits) and paras 11.6 and 11.5, the paragraphs that now hold that content. The validation pack lists this reading with the others.
For what differs from CAR 7-J-III, see What CAR 7-J-IV changes for scheduled commuter operators.
When the DGCA issues a new revision
A new revision changes the rules from a date. It must not change the past: a duty flown last month was legal or not under the rules in force last month. AeroLarke handles a revision in steps.
- A new rule-pack version. The platform team releases a new version of the pack, with release notes on what changed.
- Your officers adopt it. Your designated officers adopt the new version through the same maker-checker approval as any Scheme change. Nothing changes in your operation until they do.
- Values are dated. Every rule value has a valid-from date. Duties before that date are still checked against the values that applied on the day; duties from it, against the new ones.
- Recalculate. Rechecking a period after a rule change reports which results changed.
Your Scheme can always be stricter than the CAR. It can be less strict only where your regulator has approved a variation, recorded in AeroLarke with the approval letter and its dates.
Each legality result carries the rule-pack version it was checked with, so a result can always be traced back to the rules behind it.