Skip to content

Roster planning, checked as you build

Drag a flight onto a crew row, add a duty code across a week, swap a captain: each change is checked against the CAR and your approved FDTL Scheme before it saves, and the result says exactly why.

Rows of soft rounded bars laid out like a crew roster across a dawn sky, a thin line marking now and a lark perched on it

Every result explains itself

Each assignment opens a legality report. A violation names its paragraph and the earliest legal time; a warning means a planning buffer is close; a legal result says how much is left.

Legality, FO K. TanakaProposed DM 309, 17-Nov-2026, CAR 7-J-III
  • Violation – para 10.1 – rest before duty 10:50 is short of the required 12:00 by 1:10.

    Limit
    12:00
    Actual
    10:50
    Margin
    −1:10

    Earliest legal report: 07:40. Or assign DM 309 to another first officer.

  • Warning – para 8 – flight time in 28 days 97:30 is within limit 100:00 with 2:30 to spare.

    Limit
    100:00
    Actual
    97:30
    Margin
    +2:30

    Legal, but inside the planning buffer. A delay could make it a violation.

  • Legal – para 6.1 – FDP 9:40 is within limit 12:00 for 4 landings with 2:20 to spare.

    Limit
    12:00
    Actual
    9:40
    Margin
    +2:20

Screens your schedulers already know

Dense grids, right-click actions, keyboard entry and the words your team already uses, such as sector, STD and STA, FDP and PIC. Switch to compact rows to see a whole base on one screen.

Crew, base VOBL
Example crew list in comfortable density: today’s duty, FDP, 28-day flight time remaining and legality
Crew28-day leftLegality
A. Okafor21:20Legal
S. Rao46:50Legal
K. Tanaka2:30Warning
J. Moreau52:15Note
L. Fernandes38:40Legal
M. Haddad61:10Legal
CtrlK
Find crew, flights and screens
ShiftF10
Open the actions for a duty
A
Assign crew to the selected flight

What it does

Roster board
Open flights above, crew rows below, drag and drop. Right-click to assign, assign as positioning or show available crew; hover for rank, qualifications and remaining limits.
Live legality
Flight time, FDP, landings, rest, weekly rest, night duty, cumulative limits, qualifications and recency, on every change, with no recalculate step.
Breaches need a named approver
A Restrict breach blocks the assignment, approval and publication unless a designated officer approves an override with a written reason. The requester can never approve it.
Planning buffers
A warning when crew come within your Scheme’s buffer of any limit, before it becomes a violation.
Monthly planner and daily schedule
Duty codes across a date range in one action, repeating timetables for a season, copy a day; Excel import with a dry run first.
Look-ahead
Next earliest report for every crew member, and 7- and 28-day flight time and duty for each of the next three days.
Publish and acknowledge
Each publication is a version, with weekly rest shown. Crew acknowledge it in the app.
Fleets, tails and roles
Tail assignment and swaps across fleets; PIC and co-pilot roles checked against each crew member’s designation and qualifications.

See it working on a demo operator

We show you the screens with demo data, then talk through your own Scheme, fleet and bases.